Water Main Replacement, DeMott Avenue, Clifton
Project Overview
Project Number: 25-B-02
Estimated Budget: $2.1 million
Start Date: September 28, 2026
Anticipated Completion: Q4 2026
Contractor: Montana Construction Inc.
Project Description:
We’re replacing approximately 3,100 linear feet of existing 6-inch cast iron from Paulison Avenue to 3rd Street and on Madison Avenue from Hawthorne Avenue to Jewett Ave with a new 12-inch ductile iron main.
This project includes the replacement of 3,100 LF of existing 6-inch water main installed between 1906-1911 with a new 12-inch ductile iron water mains, new valves, hydrants, and a new 1-inch service connections. The anticipated construction costs are estimated to be around $2.1 million.

Project Overview
Project Number: 25-B-02
Estimated Budget: $2.1 million
Start Date: September 28, 2026
Anticipated Completion: Q4 2026
Contractor: Montana Construction Inc.
Project Description:
We’re replacing approximately 3,100 linear feet of existing 6-inch cast iron from Paulison Avenue to 3rd Street and on Madison Avenue from Hawthorne Avenue to Jewett Ave with a new 12-inch ductile iron main.
This project includes the replacement of 3,100 LF of existing 6-inch water main installed between 1906-1911 with a new 12-inch ductile iron water mains, new valves, hydrants, and a new 1-inch service connections. The anticipated construction costs are estimated to be around $2.1 million.

-
Work to Begin September 21, 2026
Passaic Valley Water Commission is committed to providing our customers with high-quality drinking water and service. As part of our on-going improvement program, we are installing a combined total of 3,100 linear feet of 12-inch ductile iron pipe on DeMott Avenue from Paulison Avenue to Third Street and on Madison Avenue from Hawthorne Avenue to Jewett Avenue. Please note that parking and access may be restricted for limited times at these locations.
Please be advised that this work is scheduled to begin on Monday, September 21, 2026, and will be completed near the end of the year. The working hours will range from 7:00 a.m. to 4:00 p.m., Monday through Friday.
INCONVENIENCE IS TEMPORARY – IMPROVEMENT IS PERMANENT
This effort may result in some unavoidable noise, disruption of service and discoloration to the water. Customers are cautioned to determine if the water is clear before washing clothes (or any other processing), as staining may occur. We apologize for any inconvenience this may cause.
We will make every effort to minimize the disturbance and will work closely with local police and officials to reduce traffic problems.
IF YOU HAVE ANY CONCERNS
Please call our customer service team at (973) 340-4300 (option 2) during regular working hours.
These improvements will help us to continue to give you dependable water service. Thank you for your patience and cooperation. Customers can follow project updates and learn more about the DeMott Avenue Water Main Replacement Project by visiting Water Main Replacement, DeMott Avenue, Clifton | Engage PVWC.
Passaic Valley Water Commission is committed to providing our customers with high-quality drinking water and service. As part of our on-going improvement program, we are installing a combined total of 3,100 linear feet of 12-inch ductile iron pipe on DeMott Avenue from Paulison Avenue to Third Street and on Madison Avenue from Hawthorne Avenue to Jewett Avenue. Please note that parking and access may be restricted for limited times at these locations.
Please be advised that this work is scheduled to begin on Monday, September 21, 2026, and will be completed near the end of the year. The working hours will range from 7:00 a.m. to 4:00 p.m., Monday through Friday.
INCONVENIENCE IS TEMPORARY – IMPROVEMENT IS PERMANENT
This effort may result in some unavoidable noise, disruption of service and discoloration to the water. Customers are cautioned to determine if the water is clear before washing clothes (or any other processing), as staining may occur. We apologize for any inconvenience this may cause.
We will make every effort to minimize the disturbance and will work closely with local police and officials to reduce traffic problems.
IF YOU HAVE ANY CONCERNS
Please call our customer service team at (973) 340-4300 (option 2) during regular working hours.
These improvements will help us to continue to give you dependable water service. Thank you for your patience and cooperation. Customers can follow project updates and learn more about the DeMott Avenue Water Main Replacement Project by visiting Water Main Replacement, DeMott Avenue, Clifton | Engage PVWC.
-
Design
Water Main Replacement, DeMott Avenue, Clifton has finished this stage -
Construction
Water Main Replacement, DeMott Avenue, Clifton is currently at this stageConstruction started September 28, 2026
-
Completion
this is an upcoming stage for Water Main Replacement, DeMott Avenue, Clifton
1. Secures a stronger water network for the Passaic Valley Water System
The new 12-inch water main will provide improved flows and pressures and resiliency for customers in the project area by connecting to higher capacity main on Paulison Avenue.
2. Addressing Aging Infrastructure
The existing water mains located within Demott Street project area range from 115 to over 120 years old. The project area has experienced water quality issues, and lower than average pressures causing significant inconvenience to our customers in the area. Replacing them is essential to ensure a reliable and efficient water supply for customers.
3. Supporting Community Growth and Development
Reliable water services are fundamental to attracting new businesses and residents, thereby contributing to the economic growth of the area. The Water Main Replacement, DeMott Avenue, Clifton is a strategic investment that addresses critical infrastructure needs, enhances public safety, and supports the sustainable growth of the community.
Live Projects
- Water Main Replacement, North Arlington Beech Street Area
- Water Main Replacement, Clifton and Passaic: Paulison Ave (Highland Ave to Lincoln St) Phase 1
- Transmission Main Replacement at the Great Falls National Park, Paterson
- Water Main Replacement, Fordham Road, Clifton
- Water Main Replacement, Lafayette Ave, Passaic
-
Phone 973-340-4300 Email CustomerService@pvwc.com