Emergency Repairs at Chittenden Rd, Clifton

Project Overview

Project Number: 26-B-01

Estimated Budget: $4.5M

Start Date: March 23, 2026

Anticipated Completion: Q2 2027

Contractor: Montana Construction


Project Description:

On March 23, 2026, a significant water main leak was discovered beneath Chittenden Road., Clifton.

Construction includes:

  • Replacement of more than 100 feet of large, 48-inch water transmission main.
  • Installation of two new large valves, providing better control over water flow and improving our ability to respond to future emergencies.
  • Construction of a new emergency connection with the Jersey City Municipal Utilities Authority, strengthening the reliability of the regional water supply.
  • Replacement of approximately 150 feet of an older 12-inch water main.
  • Installation of new storm sewer infrastructure.
  • Creation of a new access point that will allow us to inspect and monitor the pipeline more effectively in the future.


Project Overview

Project Number: 26-B-01

Estimated Budget: $4.5M

Start Date: March 23, 2026

Anticipated Completion: Q2 2027

Contractor: Montana Construction


Project Description:

On March 23, 2026, a significant water main leak was discovered beneath Chittenden Road., Clifton.

Construction includes:

  • Replacement of more than 100 feet of large, 48-inch water transmission main.
  • Installation of two new large valves, providing better control over water flow and improving our ability to respond to future emergencies.
  • Construction of a new emergency connection with the Jersey City Municipal Utilities Authority, strengthening the reliability of the regional water supply.
  • Replacement of approximately 150 feet of an older 12-inch water main.
  • Installation of new storm sewer infrastructure.
  • Creation of a new access point that will allow us to inspect and monitor the pipeline more effectively in the future.


  • Update on Water Main Repairs & Roadway Restoration

    November 3, 2026

    To Our Neighbors on Chittenden Road

    Re: Chittenden Road Water Main Repairs and Roadway Restoration


    Dear Neighbor,

    Over the past several months, you have experienced considerable disruption as a result of the water main repairs along Chittenden Road. We recognize that the construction, excavation, traffic restrictions, and temporary roadway conditions have been inconvenient, particularly for those of you living immediately adjacent to the work. We sincerely appreciate your patience and would like to explain what has been accomplished, why the project has taken so long, and what remains to be done before the roadway can be permanently

    November 3, 2026

    To Our Neighbors on Chittenden Road

    Re: Chittenden Road Water Main Repairs and Roadway Restoration


    Dear Neighbor,

    Over the past several months, you have experienced considerable disruption as a result of the water main repairs along Chittenden Road. We recognize that the construction, excavation, traffic restrictions, and temporary roadway conditions have been inconvenient, particularly for those of you living immediately adjacent to the work. We sincerely appreciate your patience and would like to explain what has been accomplished, why the project has taken so long, and what remains to be done before the roadway can be permanently restored.


    Why was this project so complicated?

    On March 23, 2026, a significant water main leak was discovered beneath Chittenden Road. What might initially have appeared to be a straightforward repair turned out to be a particularly complex undertaking.

    Beneath this area are several large transmission mains serving major water utilities throughout North Jersey. These pipelines are essential to providing reliable water service to tens of thousands ofresidents and businesses. Because several major water mains run through the same area, identifying and isolating the leak was challenging, and the repairs required extensive planning and coordination to avoid disrupting water service throughout the region.

    Before the damaged pipeline could even be repaired, our crews and contractors had to install three temporary devices to control the flow of water, along with two temporary bypass pipelines to maintain service while the work was performed.


    What work has been completed?

    The project ultimately involved substantially more than repairing the original leak. Among the improvements completed were:

    • Replacement of more than 100 feet of a large, 48-inch water transmission main.
    • Installation of two new large valves, providing better control over water flow and improving our ability to respond to future emergencies.
    • Construction of a new emergency connection with the Jersey City Municipal Utilities Authority, strengthening the reliability of the regional water supply.
    • Replacement of approximately 150 feet of an older 12-inch water main.
    • Installation of new storm sewer infrastructure.
    • Creation of a new access point that will allow us to inspect and monitor the pipeline more effectively in the future.

    These improvements represent a significant investment in the reliability of the water system and will help protect against future service interruptions.


    Why hasn't the road been permanently repaved?

    We understand that this is likely your most immediate concern.

    Although the primary water main repairs have been completed, there are two important steps that must take place before the roadway can receive its final paving.

    First, PSE&G must complete the relocation of utility lines in the area.

    Second, PVWC must install a specially constructed concrete access chamber over the new pipeline access point. This chamber will allow us to inspect and monitor the transmission main without having to excavate the roadway each time access is needed. Fabrication of the chamber is expected to begin shortly, with installation anticipated toward the end of 2026.

    Once the remaining underground work is completed, the disturbed ground must be given approximately 90 days to settle before permanent paving can take place. Repaving prematurely could result in an uneven roadway and the need for additional repairs.

    We currently anticipate completing the permanent roadway restoration in early spring 2027, weather permitting and subject to completion of the remaining utility work.

    In the meantime, the roadway has been temporarily patched. We recognize that temporary pavement does not provide the same smooth, finished surface as permanent paving, and we will continue to evaluate conditions and make necessary interim repairs while the remaining work is completed.


    Our commitment to you

    We understand that living alongside a major construction project is frustrating, especially when the roadway does not immediately return to its original condition once the most visible work has ended.

    We also want you to know that the work undertaken on Chittenden Road was essential to protecting a critical part of the region's water infrastructure. The repairs and improvements were successfully completed while minimizing interruptions to water service, and we are proud of the efforts of our employees, engineers, and contractors who worked together to accomplish that.

    Most importantly, we have not forgotten about the roadway or the residents who have been affected by this project. Permanent restoration remains part of our commitment, and we intend to see it through.

    We encourage all customers to scan the QR code below and register for project notifications to stay informed of the latest updates, schedules, and important information related to the Chittenden Road Emergency Repair Project.


    Thank you again for your patience and understanding. We appreciate the opportunity to serve you and look forward to bringing this project to its final conclusion.


    QR Code for Chittenden Road Project Updates

    Direct URL:

    https://our.pvwc.com/ emergency-repairs-at-chittenden-rd-clifton


    Sincerely,

    Yitz Weiss, CPA

    Interim Executive Director

    Passaic Valley Water Commission