Water Main Replacement, Clifton and Passaic: Paulison Ave (Piaget to Lincoln)

Project Overview

Project Number: TBD

Estimated Budget: $8 million

Anticipated Start: Q4 2026

Anticipated Completion: Q4 2027


Project Description:

We’re replacing an existing water main located on Paulison Avenue between Piaget Avenue and Lincoln Street upgrading the water system in Clifton and Passaic to make it stronger, safer, and ready for the future.


This project includes the replacement of 10,000 LF of an existing critical water main ranging in size from 6-inches – 16-inches installed between 1924-1971 with a new 12-inch ductile iron water main, and new valves, hydrants and service connections. The anticipated construction costs are estimated to be around $8 million.


Project Overview

Project Number: TBD

Estimated Budget: $8 million

Anticipated Start: Q4 2026

Anticipated Completion: Q4 2027


Project Description:

We’re replacing an existing water main located on Paulison Avenue between Piaget Avenue and Lincoln Street upgrading the water system in Clifton and Passaic to make it stronger, safer, and ready for the future.


This project includes the replacement of 10,000 LF of an existing critical water main ranging in size from 6-inches – 16-inches installed between 1924-1971 with a new 12-inch ductile iron water main, and new valves, hydrants and service connections. The anticipated construction costs are estimated to be around $8 million.


Questions About the Project

Have questions about the Water Main Replacement, Clifton and Passaic: Paulison Ave (Piaget to Lincoln) project?

We're here to help and will respond with the most up-to-date information as soon as we can.



You need to be signed in to add your question.